Our Process

We are proud of our process and commitment to quality. You have the choice to view our process below by watching real-life videos of us or reading our steps.
Consultation

During the initial consultation phase we get a great sense of who you are and what needs we can meet. We walk you through the entire scope of work, the type of service that’s required and create the expectation that we know we can perfectly manage.

Design & Plan

Our design and planning stage is an exciting time for us both and presents you with 4 options:

A) You’re free to consult with your chosen architect

B) Or work with us and our reputable architects to create a custom floor plan & design.

C) You’re invited to select one of our floor plans and facades

D) You’re invited to work with us on reconfiguring an existing floorplan with our in-house draftsman

No matter which option you choose, we ensure the building specifications are agreed upon, including colour selections, internal additional features and the façade. We also make it easy to visualise your new home with a 3D presentation with full renders or even a 3D video tour.

Contract

This important stage sees the formal building contracts being prepared and signed as well as finance applications being created.

Once settled, we begin preparation for building approval. This covers details including the building design, plans and chosen colours, soil testing, slab design, structural engineering, energy report and builder’s insurance being submitted to council for approval.

Construction Phase

The construction phase is seamlessly managed by our team and is strategically rolled out across different stages.

1. SITE WORKS

Site works can vary between builds. Depending on the project, this stage may involve demolishing an existing home or building retaining walls and flattening the surface to prepare it for the slab.

2.  SLAB DOWN

This stage sees the concrete slab being poured, forming the foundation of the home.
It’s important to note that all foundation plumbing works are prepped before the slab is poured.

3. FRAME

During this period, the structure of the frame is built and the eaves are created.

4. STRUCTURE COMMENCEMENT

In the structure stage, external and internal brick walls are constructed. Electricians, plumbers, and engineers install essential wiring and pipes for power, water and gas.

5. ROOF COMPLETION

The placement of the roof on the home can come in the form of either roof tiles or Colorbond steel. Once the roof is completed the gutters are added.

6. LOCKUP

This is the stage when the doors and windows throughout the home can be locked. Your home is now secure, leaving plumbers, electricians, tilers and carpenters to complete their work.

7. PLASTERING

As this stage is close to the completion of the entire build, the insulation and plastering is fitted onto the internal walls.

8. CABINETS, FIXTURES AND FITTINGS

Here, all kitchen, laundry and bathroom cabinets and benchtops, tiling, tapware, mirrors, toilet, basins, baths and shower screens are fixed into position.

Handover Phase

1. PRE-HANDOVER INSPECTION

Before handing you the keys to your brand new home, we take the time to diligently and carefully walk you through a pre-handover inspection to ensure you are satisfied with all the finishes prior to moving in.

2. GET THE KEYS

The moment you have been waiting for sees us hand the keys over to you so you can call your new house a home.

3. AFTERCARE

Our commitment to you doesn’t end when the keys are in your hands. Our warranty & support includes a 12 month warranty for any fixtures, fittings & appliances, as well as a 7 years structural warranty. You’ll be pleased to know we follow up support whenever needed.

Watch our process

1. Site Cut & Site Preparation
2. Slab Down
3. Frame & Truss installation
4. Bricking & Roofing
5. Finishing Trades
Contact us

Book a consultation with us - we'll begin to sketch and visualise your dream custom home with you

Phone 03 9436 5503
Get in touch Send an enquiry
Pittwater Road
Pittwater Road
5
4
3
1